Ministry Center Update #8

View From the Stage3 1/2 Sides CompletedMain Entry FramedFrom The Inside Out

Can you believe it? The builders have been busy this week and much has changed since our last update. (If you double click the pictures they will enlarge to ”full-screen” and you will be able to see more detail.) 

Starting at the far left, this picture was taken from the stage area looking out toward the back of the building.  Note the black pipes hanging down from the roof.  This is the sprinkler system that is a part of the fire protection system.

The picture immediately to the right shows 3 1/2 sides completed.  They should have all of the sides sheeted by the end of the week.

The picture to the right of center is taken from the outside and shows the entry way framing complete.

The picture all the way to the right is taken from the inside looking out of the main entrance. 

As you can see it is really beginning to take shape.  I believe the roof will start to go on next week and soon we will have a building with an “intact” exterior.  Say tuned for more updates.  By the way, check out my blog entitled “In My Minds Eye”.  Peace, PW

May 1, 2008 - Posted by wbauer | Ministy Center Updates | | No Comments